Bid Documents
- Invitation to Bid: COP 20, 22, 25 construction, released 1/5/21
- Addendum 1, EVOSTC-2021, Cop 20, 22, 25 construction
- Addendum 2, EVOSTC-2021, Cop 20, 22, 25 construction
- Memorandum, EVOSTC-2021
- Conformed Construction Documents
Design Documents
- 100% Design, Cop 20, 12/4/20
- 100% Design, Cop 22, 12/4/20
- 100% Design, Cop 25, 12/4/20
- 100% Design, Sher 02, 12/4/20
- 100% Project Manual, including Special Provisions, 1/4/21 (does not include drawings)
As-builts, 10/15/21
End of Season Lessons Learned: